{"id":5020,"date":"2019-08-31T16:50:30","date_gmt":"2019-08-31T16:50:30","guid":{"rendered":"http:\/\/wordpress.lvc.edu\/wordpress\/lavie\/?p=5020"},"modified":"2019-08-31T16:50:30","modified_gmt":"2019-08-31T16:50:30","slug":"bridge-construction-continues","status":"publish","type":"post","link":"https:\/\/wordpress.lvc.edu\/lavie\/2019\/08\/31\/bridge-construction-continues\/","title":{"rendered":"Bridge construction continues"},"content":{"rendered":"<div id=\"dslc-theme-content\"><div id=\"dslc-theme-content-inner\"><p><span style=\"font-weight: 400\">By Brianna Metsger &#8217;19, <\/span><span style=\"font-weight: 400\">Assistant Editor<\/span><\/p>\n<p><span style=\"font-weight: 400\">The idea for a redesigned, ADA compliant pedestrian bridge at Lebanon Valley College has been in the making for several years, and necessary approvals were obtained in time to begin reconstruction this past May.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">However, due to unexpectedly extended timelines for approvals and coordination, the bridge will not be finished in time for the start of fall semester; instead, the project will be accessible mid-October and fully completed by early November.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The footbridge connects the north and south sides of campus and allows students, faculty, staff and community members to safely cross above the railroad tracks that separate sections of LVC.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cReconstruction of the pedestrian bridge is part of the Campus Master Plan: to better create a walking campus and connect the north and south sides,\u201d Brent Oberholtzer, director of Public Safety, said. \u201cIncluded in the plan was LVC\u2019s desire to make the bridge more accessible and ADA compliant.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400\">During the winter of 2017-18, the bridge began deteriorating at an accelerated rate due to extreme cold and corrosive chemicals such as ice-preventative salt. Sections of the concrete stairs began to break away from the structure, expediting the need for reconstruction.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cThere were two main reasons for reconstructing the footbridge,\u201d Michael Mumper, director of Facilities Management, said. \u201cThe original bridge only had steps as a means of access. Therefore, the accessibility to or from the north campus via that bridge was restricted to those who were able to walk the steps. Also, the existing bridge was beginning to deteriorate.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400\">Planning for the new footbridge started after LVC was awarded a grant for the project in December, 2016, from Pennsylvania\u2019s Department of Community and Economic Development\u2019s (DCED) Multimodal Transportation Fund. LVC then received an additional grant from PennDOT and was able to finalize the designs.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Mumper had anticipated this project to be somewhat of a challenge. Cooperation from numerous external organizations and the compressed construction timeline have made the project complicated.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u201cThe bridge spans two very active Norfolk Southern rail lines,\u201d Mumper said. \u201cNorfolk Southern had very specific requirements in order to approve the design and to approve the construction plan. Additional groups involved include Met Ed, Annville Township, Lebanon County, architect, engineers and compliance requirements from two different state agencies.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400\">Though there have been no unexpected setbacks in construction thus far, Mumper says the timelines for approvals and coordination of the project have taken longer than The College had originally expected, resulting in a delay of the project\u2019s completion.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Parking at LVC will be affected by the new footbridge design. Approximately 25 parking spaces on the south side of campus were removed to accommodate the project. Only commuters, guests or visitors and approved residential students will be permitted to park along the tracks. Residential students may no longer park on the south side of campus, except for approved times during the weekends.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">Additionally, as construction continues, pedestrians are instructed to use the sidewalk of State Route 934 to cross the tracks. LVC students are advised to alert professors if additional travel time is needed to and from classes.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">No pedestrian may walk on or across the railroad tracks. Pennsylvania law allows violators to be cited with trespassing and face up to 90 days in jail and\/or receive up to a $300 fine. Norfolk Southern and Annville Police departments know of the construction and may add extra patrols to ensure the safety of all pedestrians.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400\">For more information on the reconstruction of the bridge at LVC, contact Michael Mumper, Director of Facilities Management, (<\/span><span style=\"font-weight: 400\">717)867-6340, or Brent Oberholtzer, Director of Public Safety, (717)867-6112.<\/span><\/p>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\"><p>By Brianna Metsger &#8217;19, Assistant Editor The idea for a redesigned, ADA compliant pedestrian bridge at Lebanon Valley College has been in the making for several years, and necessary approvals were obtained in time to <a class=\"mh-excerpt-more\" href=\"https:\/\/wordpress.lvc.edu\/lavie\/2019\/08\/31\/bridge-construction-continues\/\" title=\"Bridge construction continues\">[&#8230;]<\/a><\/p>\n<\/div>","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,6],"tags":[12],"class_list":{"0":"post-5020","1":"post","2":"type-post","3":"status-publish","4":"format-standard","6":"category-campus-news","7":"category-local-news","8":"tag-homepage"},"_links":{"self":[{"href":"https:\/\/wordpress.lvc.edu\/lavie\/wp-json\/wp\/v2\/posts\/5020","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/wordpress.lvc.edu\/lavie\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/wordpress.lvc.edu\/lavie\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/wordpress.lvc.edu\/lavie\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/wordpress.lvc.edu\/lavie\/wp-json\/wp\/v2\/comments?post=5020"}],"version-history":[{"count":0,"href":"https:\/\/wordpress.lvc.edu\/lavie\/wp-json\/wp\/v2\/posts\/5020\/revisions"}],"wp:attachment":[{"href":"https:\/\/wordpress.lvc.edu\/lavie\/wp-json\/wp\/v2\/media?parent=5020"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/wordpress.lvc.edu\/lavie\/wp-json\/wp\/v2\/categories?post=5020"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/wordpress.lvc.edu\/lavie\/wp-json\/wp\/v2\/tags?post=5020"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}